Up before the Planning Commission today is the authorization of a project at 459 Geary Street. The renovations to the 1922 building will convert the six floors of office space into 2 floors for an art gallery, 4 floors of office space, and a two floor dwelling unit (with a pool!) that requires a vertical addition. The Historic Preservation Commission approved a Major Permit to Alter at its hearing on July 18, 2012, so looks like smooth sailing from here.
· Downtown Project Authorization 459 Geary [SF Planning]
Filed under:
Loading comments...