Stanley Saitowitz-designed buildings are enjoying quite a year, with 1501 15th Street and 8 Octavia garnering much attention. Then there is The Central Waterfront's 616 20th Street, where the screening has been removed to reveal the distinct facade of the Saitowitz design. The 5-story building, in the pipeline since 2008, is finally nearing completion on its 16 one- and two-bedroom units, built over 3,000 sq. ft. of ground floor retail. The building will contain parking for 12 cars, and is less than 1 block from 3rd Street's T Muni line.
·Dogpatch Development Site [LoopNet]
·Stanley Saitowitz Development Rising in the Mission District [Curbed SF]
·8 Octavia Construction Moving Right Along in Hayes Valley [Curbed SF]
Loading comments...