Today's episode of Construction Watch comes courtesy of Curbed SF Flickr Pool contributor mumflwr and the Chinatown YMCA's own Flickr account. The ED2 International-designed project, which involves a new three-story east wing and a four-story rear addition to the existing building at 855 Sacramento, actually doesn't look too different compared to its September state. That left side of the addition has definitely risen a bit, though, and there's still several months to go before their targeted opening in fall 2010. Godspeed, YMCA.
· ConstructionWatch: Chinatown YMCA Still Chugging Along [Curbed SF]
· Chinatown YMCA To be Tuned, Nipped and Tucked [Curbed SF]
Filed under:
Loading comments...